Annual peak load and load curve

The load curve in the form of the grid feed-in is the sum total of all feed of grid transfer points, power plants, and distribution networks into the maximum voltage network (network area 1) in the control area of TenneT TSO GmbH.

Load curve


The load curve is the sum of the grid losses and all purchases (own consumption) of the connected converter platforms and wind farms in the grid of the offshore company

Provisional annual peak load

The annual peak load corresponds to the maximum value of the respective load curve in a calendar year. You can see the annual peak load by selecting "this year" in the date range picker. The minimum and maximum values are marked with an arrow in the curve chart.

No Data found in specified Daterange

Annual peak load


in the years 2020 – 2024

2024 Maximum voltage

56 MW on 11.11.2024 12:15pm

2023 Maximum voltage

55 MW on 11.10.2023 7:45am  

2022 Maximum voltage

55 MW on 25.05.2022 7:45pm  

2021 Maximum voltage

54 MW on 03.02.2021 09:15am  

2020 Maximum voltage

55 MW on 28.01.2020 6:00pm